AS 1657 Compliant Galvanized Steel Grating Walkway for a Melbourne Pedestrian Bridge Refurbishment, 1,400 m2

2026-11-17
Latest company cases about AS 1657 Compliant Galvanized Steel Grating Walkway for a Melbourne Pedestrian Bridge Refurbishment, 1,400 m2

Client Background

A metropolitan council in Melbourne manages a network of shared pedestrian and cyclist bridges across a river corridor. Two bridges built in the 1970s had timber decks that were rotting at the stringer interface, and the council needed a replacement deck that would last thirty years in a high-humidity, occasionally flooded environment while retaining the original heritage railings.

Project Requirements

  • Compliance with AS 1657 for fixed platforms, walkways and stairs.
  • Reduced dead load to extend the service life of the original steel stringers.
  • Slip resistance tested to AS 4586 in wet conditions, including for cyclists in rain.
  • Reduced wind loading on the bridge structure.
  • Minimal closure: the bridge is a key commuter route and could only close for two weekends.

Our Solution

Hebei Luojie Metal Products Co., Ltd engineered 1,400 m2 of galvanized steel grating with 30 x 4 mm bearing bars at 30 mm pitch, twisted cross bars at 100 mm pitch and a serrated top surface, delivered in 1,500 x 2,400 mm panels that matched the existing stringer spacing exactly. Choosing open grating over a solid deck reduced dead load by 22% and cut the wind area by roughly 60%, which the council's structural engineer confirmed removed the need for stringer strengthening.

ParameterSpecification
Product typeBridge deck & walkway grating
Bearing bar30 x 4 mm @ 30 mm pitch
Cross bar6 mm twisted @ 100 mm pitch
MaterialCarbon steel (AS/NZS 3678)
SurfaceSerrated anti-slip (AS 4586 tested)
FinishHot-dip galvanized (AS/NZS 4680)
Panel size1,500 x 2,400 mm, pre-drilled
Load rating5.0 kN/m2 + 1.5 kN point load
StandardsAS 1657 / AS/NZS 4680
Quantity1,400 m2 (two bridges)

Installation

Grating panels were also supplied with stainless drainage scuppers at the low points of each span, so that rain water leaves the deck quickly instead of pooling against the stringers.

Panels were pre-drilled to the surveyed stringer bolt pattern so that the contractor could lift, position and bolt each panel without site drilling. The first bridge was re-decked and reopened in 36 hours; the second followed two weekends later. The existing heritage railings were retained and re-anchored through the grating edge bands.

Project Results

  • Both bridges reinstated within the two permitted weekend closures.
  • Deck dead load reduced by 22%, avoiding an estimated 180,000 Australian dollars in stringer strengthening.
  • Slip resistance results exceeded the council's wet-condition specification.
  • The same grating was selected again for a third bridge in the network the following year.

Client Feedback

"The open deck solved three problems at once: weight, wind and drainage. Our engineer did not need to touch the original structure, and commuters barely noticed the closure." - Senior Engineer, City Council, Melbourne

About Hebei Luojie Metal Products Co., Ltd

Founded in 2002 in Anping County, Hebei Province, China, Hebei Luojie Metal Products Co., Ltd manufactures and exports steel grating and wire mesh products with a workforce of more than 500 people. The company supplies high-precision metal solutions to oil and gas, chemical processing, construction, mining and food filtration customers in over 50 countries across North America, Europe and Southeast Asia.